

This week my focus has really been on the shelving units in the ICA cores, I was kind of flying solo for this part because my partner in action, Mary, had to work on the front porch idea she had, more important that this right now. So I did some simple sketches to try and figure out a quick way to utilize shleves and make them function as a part of the space instead of an additive. So I think the first ICA is figured out i really like the layout of it and how it flows through the space, but the other one there is so many possibilites it seems to be more difficult. The whole area can be used but i tried to focus on the shelving above the toilet and how I make that useful for the sink area too, an early attempt at that. I also have been trying to figure out some material studies, Ward told me about a way to maybe strip some wood and piece it back together and add color or an 'eye texture' I made that up, a visually intresting component. Ive been looking into strip maybe MDF or plywood into about 2" strips and spacing them or something like that, and it would change over the course of the ribbon. Maybe a little far fetched but an idea worth exploring nonetheless. I also needed to figure out the actual heights of this ribbon because with the new roof there is a slant in the back part of both ICAs so I had to try and figure out a way to work around that and its a little harder than I thought because there is also a header that comes down from the clg. where the ICA starts to canteliever. I am trying to make the ribbon work with these slants and drop downs to make it seem as though it is a 'synthesis' to use Jordan's word. 


I am just gonna keep on going with this ribbon theme and hopefully everyone likes it and it gets built, the lack of ooooing and ahhhhing in class kinda has me worried but I guess we'll see.
