Tuesday, February 23, 2010
The Craft of Diggin Holes
This week was very exciting because we finally got out on to the site and started to get our hands dirty, literally. The mud was ridicoulous but there was nothing we could do about it so there was no getting around it. We started digging the holes for all the piers and there were 16 toatl holes, and they had to be 2 feet below the red clay that we brought onto the site. Sounds easy enough but the site that we are on had to be an old landfill or something because it was the strangest archive of things I have ever seen. Besides the huge chunks of concrete that seemed to be in every hole there were old golf clubs and shoes. It made the digging take even longer because we keep hitting things. It never felt like we were actually doing anything till the big foot system and the sonotubes got out to the site that was an exciting part because we could actually see the spots and the heights that the peirs were gonna go and that was pretty amazing. It overrided the fact that my back was as stiff as a rob because I was so sore. We we got finished with that of course it rained so when we got back out to site the holes were filled up with water and there was some weird underground drainage thing going on and as soon as we emptied a hole it would fill back up with water. It was a continous process that didn't seem to be working, then the trench happened. It was a marvel of engineering, it basically drained all the holes to the ditch at the back of the site and allowed us to put the sonotubes on and level them out. It was actually a really good way to get the water out and even though it wasn't in our property it had to be done. After we poured the concrete the next day we started to put the girders up and got those all level which took some finese and a sledge hammer to do. After those were up it really started looking like we were gonna actually build a house.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment